Friday, October 9, 2009

65th Day

What i've done today? Oh yeah, i remember. Today, myself, jack and chris follow Edward to help him assemble back all the pc which was 20 in total in the megalab at UMS. Though we didn't plan to finish it in one day but because of our GREAT teamwork, we do finish it even before 4 o'clock in the evening. Not a bad way to end another miserable 5 days though it's a bit energy consuming.

Thursday, October 8, 2009

64th Day

Another day without motivation in myself. Today, Edward bring me and Cosmas to DBKK Centre Point branch to finish the job that both me and Cornelius have done the past two days. Same as usual, we take record whole devices serial number range from HP switch, server, printer and UPS. Then, in the evening. Both me and Jack follow Benny to certain places to do some troubleshoot at the customer site and also do some printer maintenance. That is how my days ends.

Wednesday, October 7, 2009

63rd Day

Guess what? Day by day i'm feeling less motivation to go to office. I just keep doing stuff that are not even gave me any input or knowledge. Today, i continue my works yesterday with Cornelius in DBKK for half day. Then, in the evening. I again follow Cornelius with Simon. I would say that is one of a hell bored experience ever. Simon visit the incomplete office site to check the place. The visit that i thought would finish around 15 to 30 minutes were extend nearly 1 hour and a half because of those long and lost in translation discussion between them (Johny and Goh also visit the place with other more boss from other place). Gosh. How actually i'm gonna score for my grade in Industrial Training if goes on like this.

Tuesday, October 6, 2009

62nd Day

Today, it's my first task together with Cornelius. Cornelius were asked to tag or in other words stick the sticker as a record for next year PM in DBKK. It's actually not a work that needs any specialty as we only need to match the number on the sticker with the serial number of the device. That's all we need to do. And that work continue until at the end of the day and i think we will still go there tomorrow. We just have to wait and see.

Monday, October 5, 2009

61st Day

What actually i've done today? Nothing in the morning as both me and Larry waiting for Kevin as we thought we will go out to start the task where we will have to take shop lot picture. Than we were told by Kevin it's still not sure yet. Than that evening. Both me and Larry were bring by Edward to Desa Lok Kawi (with Kristy and Kenny as Edward also bring them after fetch them from DBKK) to troubleshoot some network printer problem. But sadly, that problem are not settle yet as we only managed to connect one client pc to the server printer after we changed the domain to workgroup in the server printer. That's how my day were spent.

Sunday, October 4, 2009

26/09 - 02/10

Well, well. It's been ages since i last post on my blog. I seems to be a bit lazy and got tendency to become more lazier. ^o^ Let's cut the story short and back to the report.

26/09

Hmm. It's been a week plus for this one. What actually i've done that day? I remember that morning i follow Benny to send invoice to the customer site while Kristy and Jack follow Kenny to DBKK half day. Then, at the evening again i follow Benny but this time both Jack and Kristy also follow us. I think that's all activity i've done that day.


28/09 to 29/09

Ok. I confuse and forgot about this two days. I remember i went to JPSM with Jack, Cosmas and Edward to do some PM either monday or tuesday. Then, the next day or the first day either monday or tuesday i follow Edward and Benny with Larry and Jack to send invoice. And a funny incident happen at that moment, the van that we used (supposedly me and Jack follow Benny using Mr.Hiew brother's car but the car parking hydraulics is having a problem, so we follow Edward and seems we are sharing the van)
are unable to start and we are forced to push the van manually to start the engine. Hahahaha. That is a very bad day for us.

30/09 to 01/10

Starting that day, both me and Larry are involved in a new project supervise by Christina (the programming department boss) and Kevin. Well, not many things could i say since it's not exactly an IT works related. It more to the geographical site works as we have to take photos of the shop lot in KK and map it to the server. Haven't start the photo taking part but the part where we have to rename the photo using the standard naming they designed as it helps the system to read the details of each of the photo is quite boring. Not quite actually, it is boring. We have to see hundreds of shop lot picture and have trace the details of the picture by referring to the excel file where all the shop lot data were put. Basically, that's how my two days out of my five days works were spent that week.

02/10

One of the worst and tired working days during my practical. The works is simple. Transfer 43 pc's from megalab to the Canselory Hall in UMS. Sounds easy than it looks. The part where we have to take the whole 43 pc's is actually the hardest part. The worst part of all, we have to do that while there are plenty of students in the lab at that time. Gosh, i'm so angry and unsatisfied. It really felts that we (myself, Larry, Cosmas and Christ) were used. =,="
Luckily i'm involved in a new project though i'm not very sure also about it. We just have to wait and see.